Inspection and Testing

Inspection and Testing

  • Fabric tests will be done in BV, SGS or ITS before shipment.
  • Inspection will be conducted according to AQL 2.5 or 4.0 by the QC/QA Team consisting of six QC/QA staff members.
  • In addition to factory inline inspections, the QC team will also do initial, interim and final inspections before shipment.

 

QC Team